Sign In | Join Free | My hardware-wholesale.com
China HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD logo
HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD
Pipe Fitting/Elbow/Flange/Tee/Reducer/cap
Active Member

5 Years

Home > Steel Pipe Cap >

14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought

HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD
Contact Now

14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought

  • 1
  • 2

Brand Name : HEBEIPENGXIN

Model Number : ASTM A234 Gr.WPB Carbon Steel Cap, ASME B16.9, Wrought, 14 Inch, SCH 20, SMLS, Coating.

Certification : ASME

Place of Origin : CHINA

MOQ : 20 Pcs

Price : Depending on quantity

Payment Terms : T/T

Supply Ability : 100000 Tons per year

Delivery Time : 2-10weeks

Packaging Details : Plywood cases or pallets

Material : carbon steel

Type : Cap

Standard : ASTM

Packing : Plywood cases or pallets

Contact Now

ASTM A234 Gr.WPB Carbon Steel Cap, ASME B16.9, Wrought, 14 Inch, SCH 20, SMLS, Coating.

Steel pipe cap refers to pipe fittings welded to the end of the pipe or threaded to cover the pipe. According to the material can be divided into carbon steel pipe cap, alloy steel pipe cap, stainless steel pipe cap.
The steel pipe cap is used to close the pipe and acts the same as the pipe plug. The form of blind plate is close, but the blind plate is detachable and the welded pipe cap is not detachable. The cap comprises a convex cap, a conical shell, a variable diameter section, a flat cover and a design of.

Characteristics of pipe caps
1. sanitation, non-toxic: this product is green building materials, can be used in pure drinking water pipeline system.
2. heat resistance: under the specified long-term continuous working pressure, the water temperature of pipeline transportation can reach 95℃.
3. corrosion resistance, no scaling: can avoid pipe fouling blockage and water basin, bathtub macular rust worry.
4. heat preservation and energy saving: thermal conductivity is only metal

Type
The form of blind plate is close, but the blind plate is detachable and the welded pipe cap is not detachable. The cap comprises a convex cap, a conical shell, a variable diameter section, a flat cover and a tight port.
Convex tube cap includes: hemispherical tube cap, elliptical tube cap, disc tube cap and ball crown tube cap. From the point of view of force, the hemispherical tube cap is not good, but from the point of view of manufacturing difficulty, it is easy to manufacture.
Parameters
Stainless steel :304 304L 316 316L 321 2520 310.317, etc.
Path: DN15-DN1200
Wall thickness: SCH5-SCH160
Standard: ASME DIN JIS BS GB/T JB SH HG, as follows: GB/T12459-2017,GB/T13401-2017,ASME B16.9,SH3408,:
SH3409,HG/T21635,DL/T695,SY/T0510,DIN2617

Uses: Water, beverage, beer, food, petrochemical, nuclear power, machinery, medical equipment, chemical fertilizer, shipbuilding, waterproof treatment, plumbing, etc
Packing: Wooden cases, cartons
Avoid splicing at the r of the disc cap and reduce thinness and high stress.
The weld direction requirement is only radial and circumferential. The large cap may cancel this requirement in the future. The distance of splicing should be more than 3δ, and not less than 100 mm. So avoid the high stress zone, which is related to thickness. The stress attenuation length is greater than 3δ, and not less than 100 mm according to practical experience). But the refrigeration equipment is very difficult to meet this requirement, has its particularity.
After splicing the head, splicing weld should be 100% ray or ultrasonic inspection, qualified grade with the equipment shell. The final weld inspection grade and proportion are the same as the equipment shell, which is high waste. Example: if the equipment shell is 20% test, III qualified. And the weld seam and final weld seam are III qualified, welding joint coefficient of 0.85;
If the equipment shell is 100% test, II qualified. And the weld seam and the final weld seam are II qualified, and the coefficient of welded joint is 1

So stuffy splicing although 100% detection, but the level of eligibility is different, with the equipment shell.
But pay attention to the process manufacturing process:
The correct approach is: blanking (marking)- small plates assembled into large plates - molding - nondestructive testing
If it is wrong to test before molding, the quality of the product after molding can not be guaranteed. That is to say, nondestructive testing refers to the final nondestructive testing.

We should pay attention to the process of manufacturing: the correct way is: material (line)-small plate assembly-molding-non-destructive testing if the type before the test is wrong, can not ensure the quality of the product after molding. That is to say, nondestructive testing refers to the final nondestructive testing. The pipe cap is not very common in industrial buildings. It is only used at the end of the pipe to close the pipe. It is basically the same as the blind plate, that is, the blind plate can be removed, but the cap can not be removed. The cap is welded to the pipe and is very close to the blind plate.

Chinese name

管帽

another name Head, plug, cover, pipe cover, stuffy head
Name of foreign language

casing) cap

use Sealing pipes

14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought

14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought


Product Tags:

ASME B16.9 steel pipe end caps

      

14 Inch SCH 20 steel pipe end caps

      

ASTM A234 Gr.WPB steel buttweld caps

      
China 14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought wholesale

14 Inch SCH 20 ASME B16.9 ASTM A234 Gr.WPB Steel Pipe End Caps Wrought Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)